Institutional Building

Asia School of Business Academic Building

Delivering a 2,239-ton structural steel package for the Asia School of Business (ASB), established by Bank Negara Malaysia, through engineering-led planning, precision fabrication, and complex roof steel installation.

The Challenge

The site's tower crane lacked the capacity to lift the original 25-ton single-member truss at the required radius.

The Solution

Segmented the truss into manageable pieces and designed custom, high-precision factory-built bolted connections to completely eliminate hazardous site welding.
Read Case Study

Urban Infrastructure

Phileo Damansara 60m MRT Link Bridge

Managing the transportation, heavy lifting, and precision installation of a 60-metre steel link bridge within a highly constrained live urban environment.

The Challenge

Installing a large steel link bridge accurately between existing buildings while working within limited tolerances and a busy urban environment.

The Solution

Applied continuous survey verification, detailed lifting analysis, crane studies, and transportation planning to achieve safe and accurate installation.
Read Case Study

Value Engineering & Optimisation

Proton EV Factory Steel Structure Optimisation

Reducing steel tonnage, simplifying structural framing, and improving construction efficiency through engineering-led optimisation without compromising structural performance.

The Challenge

The original steel structure design used conservative member sizing and over 2,500 installation members, increasing cost and construction complexity.

The Solution

Used FEM analysis to optimise the structural design, adopt economical steel sections, and reduce installation members to approximately 1,500.
Read Case Study

Commercial & Landmark

KL Midtown "Tree of Life" Iconic Structure

Engineering an iconic steel structure with over 60 intricate branches, requiring exceptional precision and seamless coordination with the glass panel system.

The Challenge

Coordinating over 60 intricate steel branches with concealed connections and precise glass alignment within a one-month construction programme.

The Solution

Segmented the truss into manageable pieces and designed customVerified the structure through a full-scale 1:1 factory mock-up and pre-assembly strategy, reducing installation risk and completing the project in approximately half the allocated timeframe. high-precision factory-built bolted connections to completely eliminate hazardous site welding.