|
Metal Builders have established
an excellent customer base and
have supplied and erected steel
portal frames for Kuala Lumpur
International Airport and Proton
City.
The steel frames are designed
using the specialised computer
design software. By calculating
the load requirements and
tailoring the beam fabrication
to suit the specific load,
savings as high as forty percent
(40%) can be realised when
compared to conventional hot
rolled sections. Savings are
realised from the tapered
section beam web and
considerably reduced plate
thickness achieved through use
of high tensile material.
Exceptionally wide spans are
possible without additional
columns for support, thus saving
on the column steel in addition
to the steel savings from each
of the individual protal member.
If one considers building a
Factory, Warehouse, Stadium,
Hypermarket, Sports Complex or
Hanger, it is cost effective as
compared to traditional
construction methods.
|
|