[{"data":1,"prerenderedAt":401},["ShallowReactive",2],{"api-menu":3,"api-insight-page-asia-school-of-business-academic-building":135,"api-insight-pages":300},{"id":4,"documentId":5,"address":6,"siteName":7,"companyRegistrationNumber":8,"companyName":9,"phoneNumber":10,"faxNumber":11,"email":12,"embeddedMapUrl":11,"createdAt":13,"updatedAt":14,"publishedAt":15,"embeddedMap":11,"logo":16,"altLogo":22,"main_buttons":28,"footer_links":42,"social_media_links":43,"opening_hours":44,"main_navigations":57,"footer_navigations":93,"direction_links":117},25,"ewbbq8qkl0c0e78a8x3h4o64","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">SANKI-KIGYO GROUP, Lot 4701, \u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Jalan Simpah Utara, 48100 Batu Arang, \u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Selangor Darul Ehsan, Malaysia.\u003C\u002Fspan>\u003C\u002Fp>","Sanki Kigyo","198401015982 (128538-V)","Sanki-Kigyo Group","+603-6035 3999",null,"admin@sanki.com.my","2026-07-19T12:53:32.083Z","2026-07-29T02:54:36.952Z","2026-07-29T02:54:37.103Z",{"id":17,"documentId":18,"url":19,"alternativeText":11,"width":20,"height":21},14,"hsjh2z0667zyh4bxg5k1biie","https:\u002F\u002Fsanki.assetz.my\u002Flogo_48938fac06.svg",292,80,{"id":23,"documentId":24,"url":25,"alternativeText":11,"width":26,"height":27},78,"deuq7gbje36g3b4w46tsdqtw","https:\u002F\u002Fsanki.assetz.my\u002Fsanki_white_logo_3bb946930a.png",329,90,[29,35],{"id":30,"label":31,"url":32,"target":33,"style":34,"icon":11},257,"Contact Us","\u002Fcontact-us","_self","Primary (Default)",{"id":36,"label":37,"url":38,"target":39,"style":40,"icon":41},258,"Brochure","https:\u002F\u002Fsanki.assetz.my\u002FSanki_Kigyo_Group_of_Companies_2932cf58a4.pdf","_blank","Secondary","Download",[],[],[45,50,54],{"id":46,"dayOfWeek":47,"opens":48,"closes":49},52,"Monday – Friday","9:00am","5:00pm",{"id":51,"dayOfWeek":52,"opens":48,"closes":53},53,"Saturday","1:00pm",{"id":55,"dayOfWeek":56,"opens":11,"closes":11},54,"Sunday",[58,71,83,88],{"id":59,"label":60,"url":11,"open_link_in_new_tab":11,"items":61},176,"About Us",[62,67],{"id":63,"label":64,"url":65,"openLinkInNewTab":66},241,"Overview","\u002Fabout-us\u002Foverview",false,{"id":68,"label":69,"url":70,"openLinkInNewTab":66},242,"Our Team","\u002Fabout-us\u002Four-team",{"id":72,"label":73,"url":11,"open_link_in_new_tab":11,"items":74},177,"How We Work",[75,79],{"id":76,"label":77,"url":78,"openLinkInNewTab":66},243,"Our Capabilities","\u002Fhow-we-work\u002Four-capabilities",{"id":80,"label":81,"url":82,"openLinkInNewTab":66},244,"Our Facilities","\u002Fhow-we-work\u002Four-facilities",{"id":84,"label":85,"url":86,"open_link_in_new_tab":11,"items":87},174,"Our Projects","\u002Four-projects",[],{"id":89,"label":90,"url":91,"open_link_in_new_tab":11,"items":92},175,"Insights","\u002Finsights",[],[94,101,109],{"id":95,"label":60,"url":11,"open_link_in_new_tab":11,"items":96},178,[97,99],{"id":98,"label":64,"url":65,"openLinkInNewTab":66},245,{"id":100,"label":69,"url":70,"openLinkInNewTab":66},246,{"id":102,"label":73,"url":11,"open_link_in_new_tab":11,"items":103},179,[104,107],{"id":105,"label":106,"url":78,"openLinkInNewTab":66},247,"Our Capabilites",{"id":108,"label":81,"url":82,"openLinkInNewTab":66},248,{"id":110,"label":111,"url":11,"open_link_in_new_tab":11,"items":112},180,"Explore More",[113,115],{"id":114,"label":85,"url":86,"openLinkInNewTab":66},249,{"id":116,"label":31,"url":32,"openLinkInNewTab":66},250,[118,127],{"id":119,"label":120,"url":121,"iconClass":11,"icon":122},11,"Google Map","https:\u002F\u002Fmaps.app.goo.gl\u002FqdwCKYz4andAkGkQ6",{"id":123,"documentId":124,"url":125,"alternativeText":11,"width":126,"height":126},85,"u8eqzhyykany0hamgj8mhcmt","https:\u002F\u002Fsanki.assetz.my\u002Fgooglemap_c8402cda15.svg",32,{"id":128,"label":129,"url":130,"iconClass":11,"icon":131},12,"Waze","https:\u002F\u002Ful.waze.com\u002Ful?venue_id=66519073.665059659.14743193&overview=yes&utm_campaign=default&utm_source=waze_website&utm_medium=lm_share_location",{"id":132,"documentId":133,"url":134,"alternativeText":11,"width":126,"height":126},86,"ui1tkd6tz48wqjle9l84q7tm","https:\u002F\u002Fsanki.assetz.my\u002Fwaze_e174c39b01.svg",{"id":136,"documentId":137,"title":138,"slug":139,"summary":140,"location":141,"date":142,"projectScope":143,"keyHighlight":144,"category":145,"contents":158},45,"m1c55q2tqt1lsza33ghrsdlb","Asia School of Business Academic Building","asia-school-of-business-academic-building","Delivering a 2,239-ton structural steel package for the Asia School of Business (ASB), established by Bank Negara Malaysia, through engineering-led planning, precision fabrication, and complex roof steel installation.","Kuala Lumpur","2025-10-23","2,239-Ton Structural Steel Package ","25-Ton Roof Truss Optimisation",{"id":146,"documentId":147,"title":148,"slug":149,"weightage":11,"createdAt":150,"updatedAt":151,"publishedAt":152,"description":11,"thumbnailTitle":148,"icon":153},56,"vdtcsrd2n06fvel6vzfeq15o","Institutional Building","institutional-building","2026-07-27T08:33:17.824Z","2026-08-18T07:00:27.880Z","2026-08-18T07:00:27.938Z",{"id":154,"documentId":155,"url":156,"alternativeText":11,"width":157,"height":157},17,"ayv1ft3nd8ntrbnrb37hu9b5","https:\u002F\u002Fsanki.assetz.my\u002Froof_800248fba3.svg",24,[159,238,244,261,278,295],{"id":160,"images":161,"__component":237},42,[162,209],{"id":163,"documentId":164,"name":165,"alternativeText":11,"caption":11,"focalPoint":11,"width":166,"height":167,"formats":168,"hash":204,"ext":172,"mime":173,"size":205,"url":206,"previewUrl":11,"provider":207,"provider_metadata":11,"createdAt":208,"updatedAt":208,"publishedAt":208},7,"awo083ig5u3aoeqvywhm7y67","team.png",1290,645,{"thumbnail":169,"small":179,"large":187,"medium":195},{"name":170,"hash":171,"ext":172,"mime":173,"path":11,"width":98,"height":174,"size":175,"sizeInBytes":176,"url":177,"etag":178},"thumbnail_team.png","thumbnail_team_5038a3d82d",".png","image\u002Fpng",123,81.32,81322,"https:\u002F\u002Fsanki.assetz.my\u002Fthumbnail_team_5038a3d82d.png","3587ebacaba9ac420afd8b16e5c62ec8",{"name":180,"hash":181,"ext":172,"mime":173,"path":11,"width":182,"height":116,"size":183,"sizeInBytes":184,"url":185,"etag":186},"small_team.png","small_team_5038a3d82d",500,321.9,321896,"https:\u002F\u002Fsanki.assetz.my\u002Fsmall_team_5038a3d82d.png","597df43ae396b2eb6b9588a85463adbd",{"name":188,"hash":189,"ext":172,"mime":173,"path":11,"width":190,"height":182,"size":191,"sizeInBytes":192,"url":193,"etag":194},"large_team.png","large_team_5038a3d82d",1000,1243.92,1243924,"https:\u002F\u002Fsanki.assetz.my\u002Flarge_team_5038a3d82d.png","aa339959cc4d1d1839fac3832f4a801c",{"name":196,"hash":197,"ext":172,"mime":173,"path":11,"width":198,"height":199,"size":200,"sizeInBytes":201,"url":202,"etag":203},"medium_team.png","medium_team_5038a3d82d",750,375,710.89,710893,"https:\u002F\u002Fsanki.assetz.my\u002Fmedium_team_5038a3d82d.png","a18aeb1b89a94e32881284b4d218bda7","team_5038a3d82d",507.73,"https:\u002F\u002Fsanki.assetz.my\u002Fteam_5038a3d82d.png","@strapi\u002Fprovider-upload-aws-s3","2026-07-19T11:54:40.371Z",{"id":210,"documentId":211,"name":212,"alternativeText":11,"caption":11,"focalPoint":11,"width":213,"height":214,"formats":215,"hash":233,"ext":172,"mime":173,"size":234,"url":235,"previewUrl":11,"provider":207,"provider_metadata":11,"createdAt":236,"updatedAt":236,"publishedAt":236},8,"gdpthjr5uvyzbflkxgkwtjaj","founder.png",630,420,{"thumbnail":216,"small":225},{"name":217,"hash":218,"ext":172,"mime":173,"path":11,"width":219,"height":220,"size":221,"sizeInBytes":222,"url":223,"etag":224},"thumbnail_founder.png","thumbnail_founder_c6009dc622",234,156,80.53,80532,"https:\u002F\u002Fsanki.assetz.my\u002Fthumbnail_founder_c6009dc622.png","588396e01f00046208d5e53a6b9b33eb",{"name":226,"hash":227,"ext":172,"mime":173,"path":11,"width":182,"height":228,"size":229,"sizeInBytes":230,"url":231,"etag":232},"small_founder.png","small_founder_c6009dc622",333,329.66,329662,"https:\u002F\u002Fsanki.assetz.my\u002Fsmall_founder_c6009dc622.png","1ce8579964d12bd7c61621f0a588d98b","founder_c6009dc622",124.7,"https:\u002F\u002Fsanki.assetz.my\u002Ffounder_c6009dc622.png","2026-07-19T11:57:18.838Z","partial.image-sliders",{"id":239,"title":240,"description":241,"bullets":242,"__component":243},196,"Executive Summary","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">The \u003Cstrong>Asia School of Business (ASB) Academic Building, established by Bank Negara Malaysia\u003C\u002Fstrong>, involved the supply and installation of a 2,239-ton structural steel package for a landmark higher education development in Kuala Lumpur. Within this large-scale project, one of the key engineering challenges was delivering the roof steel structure under tower crane lifting limitations and complex site constraints. Sanki applied engineering-led constructability planning by segmenting the roof truss, designing bolted splice connections, coordinating detailed shop drawings, and planning a safe erection sequence. This practical engineering approach improved constructability, reduced site risks, and enabled efficient installation while maintaining structural integrity across the overall steel package.\u003C\u002Fspan>\u003C\u002Fp>",[],"partial.texts-with-bullets",{"id":245,"title":246,"description":247,"bullets":248,"__component":243},198,"1.0 Engineering Design for Constructability","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">The roof steel structure required practical engineering solutions to overcome site lifting constraints while maintaining structural performance.\u003C\u002Fspan>\u003C\u002Fp>",[249,253,257],{"id":250,"title":251,"description":252},352,"Tower Crane Optimisation","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Re-engineered the original roof truss into manageable lifting segments to suit the tower crane's lifting capacity and site conditions.\u003C\u002Fspan>\u003C\u002Fp>",{"id":254,"title":255,"description":256},353,"Bolted Connection Design","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Designed prefabricated bolted splice connections to eliminate site welding and improve installation efficiency and safety.\u003C\u002Fspan>\u003C\u002Fp>",{"id":258,"title":259,"description":260},354,"Engineering Coordination","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Balanced lifting requirements, transportation, structural stability, and installation planning through coordinated engineering studies.\u003C\u002Fspan>\u003C\u002Fp>",{"id":262,"title":263,"description":264,"bullets":265,"__component":243},199,"2.0 Shop Drawing and Installation Planning","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Detailed engineering coordination ensured the fabricated steel structure could be installed accurately across the overall building package.\u003C\u002Fspan>\u003C\u002Fp>",[266,270,274],{"id":267,"title":268,"description":269},355,"Integrated Shop Drawings","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Coordinated structural steel, roofing, ceiling, M&amp;E services, and architectural requirements to minimise construction clashes.\u003C\u002Fspan>\u003C\u002Fp>",{"id":271,"title":272,"description":273},356,"Survey Verification","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Verified actual building dimensions, structural levels, column positions, and connection interfaces before fabrication.\u003C\u002Fspan>\u003C\u002Fp>",{"id":275,"title":276,"description":277},357,"Precision Fabrication","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Incorporated verified as-built information into fabrication drawings to improve fit-up accuracy and minimise installation adjustments on site.\u003C\u002Fspan>\u003C\u002Fp>",{"id":279,"title":280,"description":281,"bullets":282,"__component":243},200,"3.0 Safe and Efficient Project Delivery","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Careful erection planning ensured every roof truss segment could be installed safely while maintaining structural stability throughout construction.\u003C\u002Fspan>\u003C\u002Fp>",[283,287,291],{"id":284,"title":285,"description":286},358,"Erection Stability Planning","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Developed a planned erection sequence with temporary bracing and support systems to maintain stability during installation.\u003C\u002Fspan>\u003C\u002Fp>",{"id":288,"title":289,"description":290},359,"Coordinated Installation","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Worked closely with the main contractor, site engineers, and lifting supervisors to safely position, align, and assemble each structural segment.\u003C\u002Fspan>\u003C\u002Fp>",{"id":292,"title":293,"description":294},360,"Improved Constructability","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Combined engineering planning, prefabrication, and coordinated installation to reduce site risks and improve construction efficiency.\u003C\u002Fspan>\u003C\u002Fp>",{"id":296,"title":297,"description":298,"bullets":299,"__component":243},197,"4.0 Project Outcome","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">The successful delivery of the Asia School of Business (ASB) Academic Building demonstrates Sanki’s capability to engineer, fabricate, coordinate, and install large-scale structural steel packages for complex institutional developments. By applying practical engineering solutions to challenging roof steel construction within a 2,239-ton structural steel package, the team improved constructability, enhanced installation safety, and delivered reliable project outcomes.\u003C\u002Fspan>\u003C\u002Fp>",[],[301,312,344,374],{"id":136,"documentId":137,"title":138,"slug":139,"summary":140,"location":141,"date":142,"challenge":302,"solution":303,"thumbnail_image":304,"category":310},"The site's tower crane lacked the capacity to lift the original 25-ton single-member truss at the required radius.","Segmented the truss into manageable pieces and designed custom, high-precision factory-built bolted connections to completely eliminate hazardous site welding.",{"id":305,"documentId":306,"url":307,"alternativeText":11,"width":308,"height":309},65,"n4x91koqd32dux7en1qq6pgk","https:\u002F\u002Fsanki.assetz.my\u002Ff0fd64752feac299138a53af3c02f23c309452d9_0374b2e21a.jpg",1024,768,{"id":146,"documentId":147,"title":148,"slug":149,"weightage":11,"createdAt":150,"updatedAt":151,"publishedAt":152,"description":11,"thumbnailTitle":148,"icon":311},{"id":154,"documentId":155,"url":156,"alternativeText":11,"width":157,"height":157},{"id":313,"documentId":314,"title":315,"slug":316,"summary":317,"location":318,"date":319,"challenge":320,"solution":321,"thumbnail_image":322,"category":328},49,"pi2wzea48kkxmkc366i81nqo","Phileo Damansara 60m MRT Link Bridge","phileo-damansara-60m-mrt-link-bridge","Managing the transportation, heavy lifting, and precision installation of a 60-metre steel link bridge within a highly constrained live urban environment.","Damansara","2016-07-01","Installing a large steel link bridge accurately between existing buildings while working within limited tolerances and a busy urban environment.","Applied continuous survey verification, detailed lifting analysis, crane studies, and transportation planning to achieve safe and accurate installation.",{"id":323,"documentId":324,"url":325,"alternativeText":11,"width":326,"height":327},87,"vg3gvvvkxuwa3uo374hdtlns","https:\u002F\u002Fsanki.assetz.my\u002FSBK_Line_Phileo_Damansara_Entrance_A_1_5cebbb20d9.jpg",4032,2223,{"id":329,"documentId":330,"title":331,"slug":332,"weightage":333,"createdAt":334,"updatedAt":335,"publishedAt":336,"description":337,"thumbnailTitle":338,"icon":339},39,"p962wr3q50vecxq5lgki7rxp","Infrastructure ","infrastructure",2,"2026-07-19T12:26:17.305Z","2026-07-23T05:30:38.593Z","2026-07-23T05:30:38.655Z","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Bridges, flyovers and railway steelwork engineered for lasting performance.\u003C\u002Fspan>\u003C\u002Fp>","Infrastructure",{"id":340,"documentId":341,"url":342,"alternativeText":11,"width":343,"height":343},66,"sfwagkdi8e1r1wvy959uxiyh","https:\u002F\u002Fsanki.assetz.my\u002Fgolden_gate_bridge_1_52249e6758.svg",50,{"id":343,"documentId":345,"title":346,"slug":347,"summary":348,"location":349,"date":350,"challenge":351,"solution":352,"thumbnail_image":353,"category":359},"mik62ikabf6r2otpjibevjxs","Proton EV Factory Steel Structure Optimisation","proton-ev-factory-steel-structure-optimisation","Reducing steel tonnage, simplifying structural framing, and improving construction efficiency through engineering-led optimisation without compromising structural performance.","Tanjung Malim ","2025-12-31","The original steel structure design used conservative member sizing and over 2,500 installation members, increasing cost and construction complexity.","Used FEM analysis to optimise the structural design, adopt economical steel sections, and reduce installation members to approximately 1,500.",{"id":354,"documentId":355,"url":356,"alternativeText":11,"width":357,"height":358},59,"vqx2jvcbfkgk21g3dm1kfzcr","https:\u002F\u002Fsanki.assetz.my\u002F33_Tialoc_Proton_EV_Tanjung_Malim_7c56981925.jpg",2000,1125,{"id":360,"documentId":361,"title":362,"slug":363,"weightage":364,"createdAt":365,"updatedAt":366,"publishedAt":367,"description":368,"thumbnailTitle":369,"icon":370},61,"w0rvcm11sluym5xq8iu0a8tf","Industrial ","industrial",3,"2026-07-22T01:33:27.573Z","2026-08-18T08:14:10.118Z","2026-08-18T08:14:10.194Z","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Reliable structural steel for industrial developments and manufacturing plants.\u003C\u002Fspan>\u003C\u002Fp>","Industrial",{"id":371,"documentId":372,"url":373,"alternativeText":11,"width":343,"height":343},72,"atj7fpdiuv2qahg13urnw7kb","https:\u002F\u002Fsanki.assetz.my\u002Fgears_1_5a13b5fd3d.svg",{"id":160,"documentId":375,"title":376,"slug":377,"summary":378,"location":141,"date":142,"challenge":379,"solution":380,"thumbnail_image":381,"category":387},"onwww61kk0cb1itq5271iozp"," KL Midtown \"Tree of Life\" Iconic Structure","kl-midtown-tree-of-life-iconic-structure","Engineering an iconic steel structure with over 60 intricate branches, requiring exceptional precision and seamless coordination with the glass panel system.","Coordinating over 60 intricate steel branches with concealed connections and precise glass alignment within a one-month construction programme.","Segmented the truss into manageable pieces and designed customVerified the structure through a full-scale 1:1 factory mock-up and pre-assembly strategy, reducing installation risk and completing the project in approximately half the allocated timeframe. high-precision factory-built bolted connections to completely eliminate hazardous site welding.",{"id":382,"documentId":383,"url":384,"alternativeText":11,"width":385,"height":386},149,"lmcivt1we3mnijbzs4iej6vh","https:\u002F\u002Fsanki.assetz.my\u002FIMG_20260723_WA_0053_4fbaf68860.jpg",2560,1440,{"id":388,"documentId":389,"title":390,"slug":391,"weightage":392,"createdAt":393,"updatedAt":394,"publishedAt":395,"description":396,"thumbnailTitle":390,"icon":397},60,"b156na824ipuc89cp2ubpzuv","Commercial & Landmark","commercial-and-landmark",4,"2026-07-22T01:35:01.599Z","2026-08-18T08:13:24.840Z","2026-08-18T08:13:24.902Z","\u003Cp>\u003Cspan style=\"white-space:pre-wrap;\">Precision steel structures for landmarks and commercial buildings.\u003C\u002Fspan>\u003C\u002Fp>",{"id":398,"documentId":399,"url":400,"alternativeText":11,"width":343,"height":343},73,"jb3si9komhoe10v2vfgnvbyf","https:\u002F\u002Fsanki.assetz.my\u002Fskyscrapers_1_ea5c87cfd2.svg",1787040923758]